Federal
NASA Ames Collaborative Support Facility, Bldg. N232 is a new building located at Moffett Field, CA. The building and on-site work has been constructed as sustainable entities. The project is designed with a goal to achieve LEED-NC v2.2 Platinum Certification. The new facility consists of a 2-story structural steel framed building of approximately 50,000 square feet.
The building is comprised of two separate wings, two stories each with mechanical penthouses on the roofs. In addition to the open office space, the building includes a glass wall atrium, accessible restrooms, a lunchroom, elevator, and mechanical/electrical support areas. Construction also includes complete electrical and data communications to support the building operations, photovoltaic power and solar hot-water systems, fire detection and suppression systems, an advanced lighting system, and security systems. The site includes preparation and site utilities, installation of approximately 60 geothermal wells, new roadways and parking. This project also consisted of a new substation requiring Smith & Sons Electric to do a shutdown at the NASA Ames facility.
NASA Ames Sustainability Base
$2,100,000
Owner:
NASA
General Contractor:
Swinerton Builders
Contract Value: